All 16 tags

The ATR 100 002 left Mals station a few minutes ago. Work on electrifying the line’s lowermost section is currently in full swing. As the tunnel cross-sections need to be widened in some tunnels, a rail replacement service has been put in place between Töl and Meran. From mid-2023, trains will only run from Monday to Friday to allow the electrification work to progress more quickly. After that, new Alstom Coradia Stream trains will be introduced.

Automatically translated from German. Show the original

Operator
SAD
Vehicle family
GTW
Line
100
Taken
5. Nov. 2022, 11:06 a.m.
Camera position
From the ground
Photo type
Railway
Focal length
31 mm

0 comments

Sign in · Register Sign in to comment. New accounts are reviewed first.

No comments yet.