All 17 tags

Preparations for the forthcoming test run with the recently overhauled vertical-boiler locomotive No. 7

Automatically translated from German. Show the original

Vehicle
H 1/2 7
Operator
Rigibahn
Taken
13. May 2021, 8:23 a.m.
Camera position
From the ground
Focal length
45 mm

0 comments

Sign in · Register Sign in to comment. New accounts are reviewed first.

No comments yet.